< Subsea Pipelines

Danny Field Development

Learn more about this project in the Gulf of Mexico.

  • Insulation: Aerogel Compression Packs
  • Length: ~65 kilometers 
  • Size: 8-inch in 12-inch pipe-in-pipe tieback
  • Depth: 827 meters
  • Location: Garden Banks block #506, Gulf of Mexico
  • Operator: Helix ERT
  • Longest aerogel-insulated pipeline